November 25, 2014

P1080887The excavator returned just before Thanksgiving to install two drywells, the septic system, and the water line in the front yard.  Here’s Glenn digging the hole for the eastern drywell.

P1080900

 

Already buried, you can see the blue pipe that will connect to the gutters and direct the water to the drywell. Here he dropped the ring into the hole that he dug.

 

P1080906

 

 

Then he brought in the cap.

P1080910

 

 

 

 

And then he disconnected the lid from the excavator.

P1080925

 

 

 

And finally he buried it. P1080883

 

 

 

 

 

 

In the same way, he installed another drywell on the west side of the house.

 

P1080882

 

 

At the same time, the plumber came and drilled a hole in the foundation for the waste pipe.  It will be connected to the septic tank.P1080881

 

 

 

Here’s the view from the inside of the house.  The waste pipe will not be buried under the slab in the basement to prevent any future troubles

 

 

 

December 1-2, 2014

P1080965

Glenn came back after Thanksgiving to install the septic tank and the leaching pool.  Here you see the septic tank already underground and he’s digging the hole for the leaching pool.

 

P1080986

The leaching pool was 3 rings high (4′ deep each). He stacked them on top of each other.  At one point, some of the sand caved in between the leaching pool and the septic tank, so he had to scoop it out so that it didn’t cause the rings to shift.

P1080994 

He covered the septic tank and connected it to the leaching pool.  He covered the leaching pool with a concrete top.

 

P1080998

 

 

The next day he dug a trench for the 1″ copper water line to the house.  By code, the trench has to be 4′ deep to be below the freeze line.

P1090007

They also dug the trench inside the basement from the front, west corner to the back, east corner.  It was only about 1′ beneath the dirt because the ground should not freeze inside the house.  There will also be a 4″ concrete slab on top of the water line.

P1090018

 

And here is the trench after the copper pipe is laid down.  I got to help the guys pull the line into to house.
P1090009

 

 

 

Here’s Glenn rolling out the copper wire from the front corner of the house to the street.


P1090013

 

 

It was a continuous line of copper except for one coupling that lies about 2′ north of the stone wall in the front yard.  You can see it here.
P1090014

 

He dug a hole under the stone wall so he didn’t need to remove it.  That made me very happy to keep the wall.  Here’s the copper line waiting for the Town water company to connect to water main in the street.P1090021

 

The inspector from the Riverhead Water District came on the same day to inspect Glenn’s work. It was approved to bury.
P1090073

 

 

The Riverhead Water District came on December 12th to run a water line to my house.  The old house was on well water, so they had to hook me up to the water main across the street.  Now I have public water. 

Photo Journal

  • In the Beginning
  • Demolition
  • Bye Bye Trees
  • Excavation
  • Foundation
  • Backfill
  • Framing – 1st Floor
  • Framing – 2nd Floor
  • Framing – Roof
  • Sheathing, Strapping, & Skirt
  • Septic, Drywells, & Water Line
  • Roof, Trims, & Tyvek
  • Windows and Decks
  • Exterior Insulation & Trims
  • Oh, what a winter…
  • Decks and Siding
  • Buried Electric & Garage Door
  • Plumbing, Electric, & HVAC
  • Underground Propane Tank
  • Walkway & Interior Stairs
  • Insulation & Sheetrock
  • Finishing

Copyright 104 Cliff Road East 2025 | Theme by ThemeinProgress | Proudly powered by WordPress