Sheathing, Strapping, & Skirt

November 14 – 22

P1080773

After the framing was done, the plywood sheathing was applied. It’s 1/2″ on the walls and 5/8″ on the roof.

 

P1080785

 

They started on the front of the house and then did the west side. In this picture, you can also see the flying rafters for the front gable.

 

 

P1080803

They did the back of the house last.  Once the sheathing was done, it looked to me like the house had burned down and was boarded up. It looked huge and a bit ugly… and dark inside!

 

P1080838

Once the plywood was up, they could add the skirt between the first and second floors.  This helps to break up the height of the house, especially in the front.  It also adds to the Craftsman style of the house.

 

P1080843

 

Here’s the view of the house –  including the skirt – from the yard next door.  Look at the height of those ladders.

 

P1080852

 

After the skirt was done and the plywood was on the roof, Robert measured the window openings one more time and Martin used a sawzall to open them up.

 

P1080848

Finally it really looks like the drawings I’ve been analyzing for more than a year.  It’s real and I still can’t believe my eyes.

 

P1080840

 

 

If you look closely, you can see that the guys built a set of temporary stairs to get into the house.  No more ladders or TGI catwalks to climb into the house.

 

P1080853

 

They also built stairs on the inside of the house to get to the second floor.  These stairs go over the balcony and are not built in the stairwell.

 

 

P1080846

 

Another thing that had to be done after the plywood sheathing was nailed was the hurricane strapping.  Here’s a photo of Marvin nailing the strapping to the walls.

 

P1080859

 

And in the basement, one of the footings for the lolly columns was in the wrong place.  So they guys dug a hole, mixed the cement, and poured the new footing.

 

P1080858

Inside the house, here’s the view from the picture window at the top of the stairs where my office will be located.  Will it be hard to get work done with this view??  The ladder adds a special touch.

Photo Journal

  • In the Beginning
  • Demolition
  • Bye Bye Trees
  • Excavation
  • Foundation
  • Backfill
  • Framing – 1st Floor
  • Framing – 2nd Floor
  • Framing – Roof
  • Sheathing, Strapping, & Skirt
  • Septic, Drywells, & Water Line
  • Roof, Trims, & Tyvek
  • Windows and Decks
  • Exterior Insulation & Trims
  • Oh, what a winter…
  • Decks and Siding
  • Buried Electric & Garage Door
  • Plumbing, Electric, & HVAC
  • Underground Propane Tank
  • Walkway & Interior Stairs
  • Insulation & Sheetrock
  • Finishing

Copyright 104 Cliff Road East 2025 | Theme by ThemeinProgress | Proudly powered by WordPress