{"id":44,"date":"2014-07-20T01:54:22","date_gmt":"2014-07-20T01:54:22","guid":{"rendered":"https:\/\/104cliffroadeast.com\/?page_id=44"},"modified":"2016-01-24T20:57:27","modified_gmt":"2016-01-25T01:57:27","slug":"chronology","status":"publish","type":"page","link":"https:\/\/104cliffroadeast.com\/?page_id=44","title":{"rendered":"Chronology"},"content":{"rendered":"<p>August 19, 2013\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 The\u00a0adventure begins.<\/p>\n<p>December 2013\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Received denial letter from Building Dept, which was needed to start Ch 12 and ZBA applications.<\/p>\n<p>February 27, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Letter of No Jurisdiction received from the DEC.<\/p>\n<p>February 2, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Received topographical survey of lot, which was required for ZBA application.<\/p>\n<p>March 10, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0\u00a0\u00a0 Test hole for Health Department dug by McDonald Geosciences.<\/p>\n<p>March 31, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0Survey for Health Department application completed.<\/p>\n<p>April 24, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0\u00a0\u00a0 Zoning Board of Appeals hearing and approval for side yard setback relief\u00a0and Chapter 12 relief. Phew.<\/p>\n<p>June 6, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Suffolk County Health Department approval for new septic system (took 8 weeks).<\/p>\n<p>July 17, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0\u00a0 \u00a0Letter of Disconnect received from PSEG (took 6 weeks).<\/p>\n<p>July 24, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Building Permit approved!<\/p>\n<p>August 4-7, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Demolition of house.<\/p>\n<p>August 20-21, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Removal of old foundation.<\/p>\n<p>August 26, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0\u00a0 Survey and staking for house footprint and elevation.<\/p>\n<p>August 29, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0\u00a0 Some trees removed.<\/p>\n<p>September 3-4, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 The rest of the trees removed.<\/p>\n<p>September 10-11, 2014\u00a0\u00a0\u00a0\u00a0\u00a0 Dug the hole for the new foundation.<\/p>\n<p>September 29-30, 2014\u00a0\u00a0\u00a0\u00a0 Poured footings for the foundation.<\/p>\n<p>October 1-4, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Poured the foundation walls.<\/p>\n<p>October 14, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Riverhead Town foundation inspection &#8211; approved.<\/p>\n<p>October 16, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Insulation foam on foundation and backfill.<\/p>\n<p>October 20, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Framing begins!<\/p>\n<p>October 20-22, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Sill plates, copper foil, strapping, rim boards, first floor joists, and subfloor\u00a0done.<\/p>\n<p>October 25-31, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Finished first and second floor framing.<\/p>\n<p>November 3-13, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0Framed the roof, starting with the open-to-below and moving west.<\/p>\n<p>November 14-22, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Plywood sheathing, strapping, and skirt done. Got temporary stairs.<\/p>\n<p>November 25 &#8211; 26, 2014\u00a0\u00a0\u00a0\u00a0 Drywells installed.<\/p>\n<p>December 1-2, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0Septic tank, leaching pool, and water line installed.<\/p>\n<p>December 2, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Riverhead Water District water line inspection: approved.<\/p>\n<p>December 2, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Suffolk County Health Department septic inspection: approved.<\/p>\n<p>December 2, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Riverhead Town strapping and sheathing inspection: approved.<\/p>\n<p>December 2-14, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Trims, soffits, and part of roof done. Two nor&#8217;easters, 4&#8243; rain, and first snowfall\u00a0during this time too.<\/p>\n<p>December 12, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Riverhead Town installed water meter and vault, connected to house water line.<\/p>\n<p>December 16-19, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Roof, trims, and Tyvek finished.<\/p>\n<p>December 30-31, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Windows installed. First and second floor decks framed.<\/p>\n<p>January 19-23, 2015\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Exterior insulation completed. Window trims and crown molding installed.<\/p>\n<p>January 27, 2015\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Front door and sliding glass doors installed the morning\u00a0before blizzard #1.<\/p>\n<p>February 23, 2015\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Work resumes after a month of snow storms and bitter cold temperatures.<\/p>\n<p>February 23-27, 2015\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Rear Timbertech deck and front stair completed.<\/p>\n<p>March 16, 2015\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 After more snow and cold temps, the siding installation finally begins.<\/p>\n<p>March 20, 2015\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 One last snowstorm of the season&#8230; 5 more inches.<\/p>\n<p>April 10, 2015\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Siding installation finished.<\/p>\n<p>May 16, 2015\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Underground electric service installed.<\/p>\n<p>May 27, 2015\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Garage door installed.<\/p>\n<p>May-June, 2015 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 HVAC installed.<\/p>\n<p>June 10-13, 2015\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Basement framing done and exterior railings installed.<\/p>\n<p>July-August, 2015\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Summer break.\u00a0 No money. No work.<\/p>\n<p>Sept 4-12, 2015\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0Work resumes. Painting of exterior trims completed.<\/p>\n<p>October 29, 2015 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 Underground propane tank installed (500 gallons).<\/p>\n<p>Nov &#8211; Dec 2015 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0Rough plumbing and electric installed; Riverhead Town inspection passed.<\/p>\n<p>November 9-16, 2015 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0Exterior walkway on east side of house installed.<\/p>\n<p>November 27, 2015 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 Interior stairs installed. Steel brackets came a few weeks later.<\/p>\n<p>December 17-31, 2015 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 Insulation and sheetrock installed.<\/p>\n<p>January 20, 2016 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 They fired up the boiler and turned on the heat. Yay, but another bill to pay.<\/p>\n<p>January 2016 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0Sheetrock taping and spackling.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>August 19, 2013\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 The\u00a0adventure begins. December 2013\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Received denial letter from Building Dept, which was needed to start Ch 12 and ZBA applications. February 27, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Letter of No Jurisdiction received from the DEC. February 2, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Received topographical survey of lot, which was required for ZBA application. March 10, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0\u00a0\u00a0 Test hole for<a class=\"more\" href=\"https:\/\/104cliffroadeast.com\/?page_id=44\" title=\"Read More\"> [&#8230;] <\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-44","page","type-page","status-publish","hentry","post-container col-md-12"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Chronology - 104 Cliff Road East<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/104cliffroadeast.com\/?page_id=44\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Chronology - 104 Cliff Road East\" \/>\n<meta property=\"og:description\" content=\"August 19, 2013\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 The\u00a0adventure begins. December 2013\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Received denial letter from Building Dept, which was needed to start Ch 12 and ZBA applications. February 27, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Letter of No Jurisdiction received from the DEC. February 2, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Received topographical survey of lot, which was required for ZBA application. March 10, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0\u00a0\u00a0 Test hole for [...]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/104cliffroadeast.com\/?page_id=44\" \/>\n<meta property=\"og:site_name\" content=\"104 Cliff Road East\" \/>\n<meta property=\"article:modified_time\" content=\"2016-01-25T01:57:27+00:00\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/104cliffroadeast.com\\\/?page_id=44\",\"url\":\"https:\\\/\\\/104cliffroadeast.com\\\/?page_id=44\",\"name\":\"Chronology - 104 Cliff Road East\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/104cliffroadeast.com\\\/#website\"},\"datePublished\":\"2014-07-20T01:54:22+00:00\",\"dateModified\":\"2016-01-25T01:57:27+00:00\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/104cliffroadeast.com\\\/?page_id=44\"]}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/104cliffroadeast.com\\\/#website\",\"url\":\"https:\\\/\\\/104cliffroadeast.com\\\/\",\"name\":\"104 Cliff Road East\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/104cliffroadeast.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Chronology - 104 Cliff Road East","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/104cliffroadeast.com\/?page_id=44","og_locale":"en_US","og_type":"article","og_title":"Chronology - 104 Cliff Road East","og_description":"August 19, 2013\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 The\u00a0adventure begins. December 2013\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Received denial letter from Building Dept, which was needed to start Ch 12 and ZBA applications. February 27, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Letter of No Jurisdiction received from the DEC. February 2, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Received topographical survey of lot, which was required for ZBA application. March 10, 2014\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0\u00a0\u00a0 Test hole for [...]","og_url":"https:\/\/104cliffroadeast.com\/?page_id=44","og_site_name":"104 Cliff Road East","article_modified_time":"2016-01-25T01:57:27+00:00","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/104cliffroadeast.com\/?page_id=44","url":"https:\/\/104cliffroadeast.com\/?page_id=44","name":"Chronology - 104 Cliff Road East","isPartOf":{"@id":"https:\/\/104cliffroadeast.com\/#website"},"datePublished":"2014-07-20T01:54:22+00:00","dateModified":"2016-01-25T01:57:27+00:00","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/104cliffroadeast.com\/?page_id=44"]}]},{"@type":"WebSite","@id":"https:\/\/104cliffroadeast.com\/#website","url":"https:\/\/104cliffroadeast.com\/","name":"104 Cliff Road East","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/104cliffroadeast.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/104cliffroadeast.com\/index.php?rest_route=\/wp\/v2\/pages\/44","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/104cliffroadeast.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/104cliffroadeast.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/104cliffroadeast.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/104cliffroadeast.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=44"}],"version-history":[{"count":65,"href":"https:\/\/104cliffroadeast.com\/index.php?rest_route=\/wp\/v2\/pages\/44\/revisions"}],"predecessor-version":[{"id":1401,"href":"https:\/\/104cliffroadeast.com\/index.php?rest_route=\/wp\/v2\/pages\/44\/revisions\/1401"}],"wp:attachment":[{"href":"https:\/\/104cliffroadeast.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=44"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}